This project involved the shell construction of a Buffalo Wild Wings restaurant at Westfield Solano Mall in Fairfield. The scope included interior and selective demolition, shoring, grading, paving, and site striping to support the new restaurant layout and operational requirements.
Structural work consisted of concrete and steel installation, rough carpentry, and targeted roofing modifications. Exterior envelope improvements included EIFS, sheet metal, caulking, and insulation to integrate the space with the existing mall structure. Interior construction featured new metal stud framing, drywall, painting, and coordinated fire sprinkler, plumbing, and electrical systems.
Electrical scope required core drilling and X-ray verification to safely modify existing infrastructure. Work was completed within an active mall environment, requiring careful coordination to maintain safety and minimize disruption to adjacent tenants and patrons.
1350 Travis Blvd
Fairfield, CA 94533
Contact us today to discuss how we can bring your vision to life with clarity, craftsmanship, and partnership.